Tulse Hill Station for Network Rail,
South East Region
This was a prototype installation of Hammond Mountbridge Adjustable frp Platform System TM. (Patent no 2515519) The work arose from an incident where a passenger slipped between the platform edge and train whilst the train was in the station.
Date: 12th March 2021
Client: Network Rail
Location: Lambeth
Station: Tulse Hill
The existing platform was part traditional build, with a suspended timber platform construction under the canopy areas. To the canopy area the timber deck and supporting timbers were removed and replaced with a frp adjustable deck laid on frp beams.
The remainder of the platform was constructed using Mountbridge Adjustable Platform Overlay System TM (Patent no: 2515519) set on concrete ground beams. These areas required parts of the platform to be raised 200mm and fully supported oversail of 180mm to achieve NR standard gauge.
Project constraints
PTI
Site Access
Public Interface
Limited track possession periods
Keeping station operational
Pedestrian management