Tulse Hill Station for Network Rail,
South East Region

This was a prototype installation of Hammond Mountbridge Adjustable frp Platform System TM. (Patent no 2515519) The work arose from an incident where a passenger slipped between the platform edge and train whilst the train was in the station.

Date:              12th March 2021

Client:            Network Rail

Location:       Lambeth

Station:          Tulse Hill

The existing platform was part traditional build, with a suspended timber platform construction under the canopy areas. To the canopy area the timber deck and supporting timbers were removed and replaced with a frp adjustable deck laid on frp beams.

The remainder of the platform was constructed using Mountbridge Adjustable Platform Overlay System TM (Patent no: 2515519) set on concrete ground beams. These areas required parts of the platform to be raised 200mm and fully supported oversail of 180mm to achieve NR standard gauge.

Project constraints

PTI
Site Access
Public Interface
Limited track possession periods
Keeping station operational
Pedestrian management

Risqs Audited
Risqs Verified
ISO 9001
ISO 14001
ISO 45001
Constructionline Gold
Passenger Safety